Will this prevent my EV from charging when I have excess solar?

Will this prevent my EV from charging when I have excess solar?

If you use software such as Charge HQ, Myenergi Zappi or the Fronius Wattpilot EV charger to charge your EV from excess solar, these systems usually look for excess exports in order to tell the car to charge at that rate.

For customers with EVs and batteries using export control, we set the maximum export to 0.01kW~0.15kW to ensure your system sees enough 'excess solar' to allow charging for your EV or battery. 

If you do not have a smart meter and are using scaled production, in order to still take advantage of these negative FiT periods to charge your EV, we recommend temporarily disabling the Solar automation via the ‘connections’ tab in the Voltello App when you want to charge your car from excess solar. You can also schedule this functionality using the Advanced options: 
  1. What are the Advanced Options in Solar for Amber? 
  2. What are the Advanced Options in Solar for Localvolts? (Coming soon)



    • Related Articles

    • What are the Advanced Options in Solar for Amber?

      You can enable advanced controls in Solar for Amber by turning them ON in the Preferences page and configuring your settings. These settings are useful if you are a battery or EV owner, and allow you more control over your system. Your Advanced ...
    • What are the Advanced Options in Solar for Localvolts?

      You can enable advanced controls in Solar for Localvolts by turning them ON in the Preferences page and configuring your settings. These settings are useful if you are a battery or EV owner, and allow you more control over your system. Your Advanced ...
    • My battery isn't charging during curtailment.

      Most batteries are configured to charge when there is surplus solar, i.e. when energy is being exported to the grid. When the Voltello link device activates export control (when we limit exports) we maintain a small level of exports (0.05 kW) to ...
    • What are the settings in the ‘Voltello Battery Solar’ Plan?

      You can set up to 4 time blocks for Charging or Discharging your batteries or Curtailing your solar inverters in the Voltello Battery Solar automation. Set your Battery Schedules For each schedule block, you can choose: Start time End time Whether to ...
    • I have two inverters, will I need two LinkPros?

      You'll only need one LinkPro for controlling both of them, as long as both inverters are compatible (Is my solar inverter compatible?). If your solar and battery setup has more than one brand of solar inverter, for example, a 5kW Fronius (compatible) ...